Home Up Property Local Area History Contact Us

Hospital

Building No: 2
Approx SQ Feet: 7920
YR Built: 1913
Architect Name:  
Construction Type: Brick Veneer on Concrete Foundation
Roof Type: Composition
Thermal Insulation Removed: No- Additional plaster issues.

Interior Asbestos Tested: 1997 

Building Details: This building served as the hospital until the facility closed. There are asbestos issues in the wall plaster that has fallen from the roof damage. Buildings 2-6 were constructed between 1912 and 1915 to adopt the cottage system. Slight variations in roof line and floor space utilization are the basic differences between these structures.
Project Status: Available/Renovation Required. Asbestos issues.

 

Copyright (c) 2007 Leslie Adams Development Inc. All Rights Reserved!

Leslie Adams Development Inc.
PO Box 503, Twin Bridges, MT 59754
406-596-3090
 

26 Acre Facility Call For Price

Beaverhead Riverfront
Lots For Sale

FOR ADDITIONAL INFORMATION CALL OR EMAIL MCCTBMT@YAHOO.COM